TÜRK TUBORG | İzmir | High-Capacity Storage Hall

Project Details

Service Type

A 50-meter-long T-Line series warehouse structure was constructed to meet Türk Tuborg's increasing inventory needs and support production processes. The project focused on maximum durability, insulation, and functionality in both the exterior and interior. Throughout the installation process, the warehouse layout and air balance were optimized, ensuring the safe storage of sensitive products.

Challenges and Solutions

Building a large area in a short time without disrupting existing factory operations. Prefabricated system components enabled rapid on-site assembly, and the modular structure ensured efficient use of space. Furthermore, operational areas were insulated during the installation, preventing production disruption.

Results

Thanks to the 2,800 m² storage area installed in just four weeks, Türk Tuborg's production and storage capacity increased, while providing a hygienic, durable, and cost-effective solution suitable for the food and beverage industry.

Technical Information and Statistics

Project Area Project Area 2,800 m²
Installation Time Installation Time 4 Weeks
Used System Used System T-Line Series Tent System
Structure Length Structure Length 50 meters
Additional Technical Features

● All steel construction components were hot dip galvanized to increase durability.
● The roof system of the structure was designed with a specially developed Thermo-Roof system to balance thermal insulation.
● The tarpaulins used as external cladding material are B1 and M2 flame-retardant tarpaulins that meet fire safety standards.

Customer Feedback or Testimonials

Türk Tuborg officials, thanks to the fast and professional approach of the RÖDER, has acquired a high-quality and spacious storage area in a short time without any disruption in the production processes.

E-Catalogue +90 216 340 89 10
More Information