A 75-meter-long T-Line series modular warehouse tent was installed to provide a flexible and durable solution to meet storage needs. The structure was designed to integrate with existing site layouts and be positioned in a way that allows for operational integration.
RÖDER's fast system components and experienced field team addressed the challenge of quickly erecting a large enclosed area under tight time constraints without disrupting existing operations, resulting in installation in just two weeks and the structure being commissioned for integrated operation.
Anadolu Isuzu quickly achieved a high-quality, safe, and durable storage area with this 1,150 m² modular tent. The speed of installation and technical flexibility offered by the T-Line system contributed to operational efficiency.
● All steel construction components were hot dip galvanized to increase durability.
● The roof system of the structure was designed with a specially developed Thermo-Roof system to balance thermal insulation.
● The tents were manufactured to withstand wind loads of 140 km/h and snow loads of 75 kg/m².
Anadolu Isuzu officials stated that this modular tent system, developed to meet their needs, was completed completely within the planned timeframe. They explained that thanks to RÖDER's solution-oriented and planned approach, they achieved a safe and efficient use of the field.