3M | Bursa | Modular Warehouse and Logistics Tent

Project Details

Service Type

An 85-meter-long T-Line series warehouse tent was constructed as part of the project planned to meet the increasing need for product and equipment storage. The structure was designed with material protection, operational flow, and environmental durability in mind, while interior air quality and accessibility were optimized. Daily operations continued uninterrupted throughout the installation process.

Challenges and Solutions

RÖDER's planned and easy-to-install equipment and experienced on-site team provided a warehouse space that could be quickly commissioned and adapted to site conditions, enabling rapid time management. Thanks to RÖDER's planned and easy-to-install equipment, the structure was installed and commissioned smoothly in just two weeks.

Results

With this 1,275 m² structure, 3M Bursa quickly achieved a high-strength, operationally integrated storage solution. Fast installation, cost-effectiveness, and system flexibility meet long-term needs.

Technical Information and Statistics

Project Area Project Area 1,275 m²
Installation Time Installation Time 2 Weeks
Used System Used System T-Line Series Tent System
Structure Length Structure Length 85 meters
Additional Technical Features

● All steel construction components have been hot dip galvanized to increase durability.
● The structure's roof system is designed with a specially developed Thermo-Roof system to balance thermal insulation.
● The tarpaulins are certified as Class B1 and M2 flame-retardant.
● The tents are designed to withstand 140 km/h wind loads and 75 kg/m² snow loads.

Customer Feedback or Testimonials

3M Bursa officials stated that the speed of the installation process and the quality of the structure fully met their expectations, and that thanks to RÖDER's professional approach, they quickly achieved a safe and functional space that met their needs.